Construction Checklist
Free & Printable
Updated 2026-07-07

RFI Checklist for Creating, Reviewing, and Tracking Requests

Use this RFI checklist to create, review, track, and document Requests for Information so field questions are answered clearly and efficiently.

This Checklist is 100% Free

Print it, copy it, bookmark it, or check items off right on this page. No signup required.

RFI Checklist for Creating, Reviewing, and Tracking Requests

Quick Summary

An RFI (Request for Information) checklist helps subcontractors submit clear questions when plans, specifications, or jobsite conditions need clarification. A well-written RFI can reduce delays, prevent rework, and create a documented record of project decisions. This checklist is useful for project managers, foremen, estimators, and office staff responsible for project communication.

When to Use This Checklist

  • When drawings or specifications are unclear.
  • When conflicting information exists in project documents.
  • When field conditions differ from the plans.
  • Before proceeding with uncertain work.
  • When additional details are needed from the design team.
  • When clarification could affect schedule, cost, or scope.
  • During project coordination meetings and reviews.

Before You Start

  • Review all relevant drawings and specifications.
  • Confirm the question cannot be answered from existing project documents.
  • Gather supporting plan sheets, photos, and field notes.
  • Verify the exact location and scope of the issue.
  • Discuss the issue with field personnel if needed.
  • Review any related RFIs that may already address the question.
  • Determine whether schedule impacts are possible.

Safety Checks

  • Identify any safety concerns related to the unclear condition.
  • Notify supervisors if work may need to stop pending clarification.
  • Document hazardous site conditions with photos if applicable.
  • Confirm temporary protections remain in place while awaiting direction.
  • Communicate unresolved safety concerns to affected crews.
  • Avoid proceeding with work that relies on assumptions.

Tools, Equipment, and Materials

  • RFI form or project management system.
  • Current project drawings.
  • Project specifications.
  • Site photos and field documentation.
  • Marked-up drawings if needed.
  • Project contact information.
  • RFI log or tracking sheet.

RFI Checklist

  • Assign an RFI number according to project procedures.
  • Enter project name and contract information.
  • Clearly identify the affected drawing sheet or specification section.
  • Describe the issue using clear, factual language.
  • State the specific question that requires an answer.
  • Include exact location information for the issue.
  • Attach supporting photos, sketches, or marked-up plans.
  • Note any known schedule impacts.
  • Identify potential cost impacts if applicable.
  • Review the RFI for clarity and completeness.
  • Submit the RFI to the correct project contact.
  • Record the submission date in the RFI log.
  • Track response deadlines and follow-up needs.
  • Distribute responses to affected team members.
  • Update drawings, field instructions, or work plans based on the response.

Documentation Needed

  • Completed RFI form.
  • Supporting photos.
  • Marked-up drawings or sketches.
  • Relevant specification sections.
  • RFI log entries.
  • Response records and correspondence.
  • Internal notes regarding resulting work changes.

Common Mistakes to Avoid

  • Submitting vague or incomplete questions.
  • Failing to reference specific drawings or specifications.
  • Leaving out photos or supporting documentation.
  • Combining multiple unrelated issues into one RFI.
  • Failing to track response deadlines.
  • Not sharing responses with affected field personnel.

End-of-Day / Final Review

  • All open RFIs have been reviewed for status updates.
  • Outstanding follow-up actions have been assigned.
  • Responses have been distributed to affected team members.
  • Project records have been updated with new information.
  • Potential schedule impacts have been reviewed.
  • RFI log is current and complete.
Built for subcontractors who want something simple

Tired of checklists living on paper, texts, and memory?

SimplySub helps subcontractors manage jobs, crews, time tracking, daily logs, photos, files, equipment, expenses, and field activity in one easy-to-use system.